Epiroc surface drill rig boring blast holes on a quarry bench

Drill Rigs & Rock Drills for Mining and Civil Excavation

Surface drill rig → underground jumbo → hydraulic breaker — engineered as one excavation chain, commissioned by our field team and supported from regional rock-tool hubs.

Drill Rig Specs Procurement Managers Compare Up Front

Expand each group for hole diameter, feed force, torque and lubrication envelopes used in tender packages.

Hole Geometry & Rock Class
Blast-hole diameter45–165 mm across surface and underground fleets
Recommended rock UCS80–280 MPa with matched bit / rod packages
Hole depth envelopeUp to 36 m surface benches; face rounds to 5.2 m underground
Rod / tube systemT38 / T45 / T51 and MF tubes with anti-jam collars
Capacity & Penetration
Net penetration rate0.8–2.4 m/min in medium-hard granite (site verified)
Shift output target180–420 drilled meters per 10-hour surface shift
Feed force12–35 kN programmable for soft to abrasive strata
Rotation torque850–2,400 Nm rock-drill packages
Drive, Air & Lubrication
PowerplantTier 4 Final / EU Stage V diesel or electric trolley options
Compressor air12–28 m³/min at 10–14 bar for flushing
Hydraulic cleanlinessISO 4406 18/16/13 target with online sampling ports
Rock-drill lubricationAuto-metered oil mist with low-level interlock

Engineering Choices That Keep Drill Fleets Productive

Four systems equipment managers audit before awarding a multi-year drill-rig frame agreement.

Hydraulic rock drill on boom with visible feed rails

Hydraulic percussion with stable torque curves

Epiroc rock drills hold percussion frequency and torque within tight bands so bit life stays predictable when UCS jumps between benches. Controllers log feed-force spikes that usually precede stuck rods, giving supervisors a chance to pull before a round stalls.

Tier 4 Final engine bay on surface drill rig

Tier 4 Final / Stage V without derating the compressor

Aftertreatment packages are sized so flushing air does not collapse when DPF regeneration starts mid-bench. Electric trolley variants cut underground ventilation load while keeping the same feed and rotation envelopes used on diesel sisters.

Drill rig undercarriage on rough quarry haul road

Undercarriage built for tramming between benches

Track frames, idlers and oscillation joints are selected for short trams over blasted rock rather than paved yards. Grease points sit where a single oiler can reach them without scaffolding, cutting the minutes lost at every pad move.

Regional parts hub shelving rock drill consumables

Global parts supply with rock-tool kits staged regionally

Bits, rods, shank adapters and breaker chisels ship from regional hubs that also stock hydraulic pumps and feed cylinders. Contracted MTTR targets keep development headings and quarry benches from waiting on air freight for common failure modes.

85Countries with active drill fleets
5,600Units shipped each year
ISO / ATEXSafety & hazardous-area packages
96%On-time parts fill on contracted SKUs

Procurement & Service Questions We Hear Weekly

Procurement & Logistics

What is typical lead time for a surface drill rig?
Standard configurations ship in 14–22 weeks depending on compressor class and cabin options; expedited slots open when a regional buffer unit matches your hole-diameter envelope.
Which Incoterms and packing options are available?
FOB, CIF and DAP are routine. Rigs leave with seaworthy cradles, moisture barriers and a commissioning crate that includes first-fill lubricants and bit starter kits.
How do you document CE and EPA Tier 4 Final compliance?
Each serial number ships with a Declaration of Conformity, engine emission family data and a noise dossier suitable for site HSE files.
Can underground packages meet ATEX expectations?
Selected jumbo and face-drill packages are available with hazardous-area electrical and lighting kits; we confirm zone assumptions before freezing the BOM.

Service & Spare Parts

What MTTR should we expect on contracted sites?
Priority sites target under 18 hours for common hydraulic and rock-drill failures when consumables are stocked locally under the parts rider.
How often should rock-drill seals and chucks be planned?
Most hard-rock fleets schedule seal kits every 800–1,200 percussion hours; we align the interval to your UCS and flush quality, not a generic calendar.
Do you support excavator-mounted hydraulic breakers?
Yes — hydraulic breaker for excavator packages include tool kits, nitrogen charge procedures and carrier oil-flow matching sheets.
Who trains operators after commissioning?
Field instructors cover collaring technique, anti-jam recovery and daily ISO cleanliness checks before handing the shift to your trainers.

Technical Downloads for Tender Packages

Spec sheets and audit templates equipment managers attach to RFQs.

PDF

Surface Drill Rig Load & Feed Chart

PDF · 2.4 MB Request file
PDF

Rock Drilling Torque Curve Pack

PDF · 1.8 MB Request file
XLSX

Emissions & Noise Audit Workbook

XLSX · 640 KB Request file
PDF

Hydraulic Breaker Carrier Match Sheet

PDF · 1.1 MB Request file
XLSX

Wear Survey Template — Bits & Rods

XLSX · 420 KB Request file
PDF

Hydraulic Sampling SOP for Drill Fleets

PDF · 890 KB Request file

Tell us the rock, the hole and the shift plan

  • Hole diameter and depth targets matched to feed force and torque
  • Surface drill rig, underground jumbo or hydraulic breaker class selection
  • CE / EPA / ATEX documentation prepared with the commercial offer
  • Parts rider options for bits, rods and breaker tools at regional hubs

Request a Drill Rig Quote

Required
Required
Valid email required
Required
Required
Describe hole diameter, rock class and duty cycle